Projects / EV charging
Two EVs, one circuit, no panel upgrade.
Cedar Park
Location
1 day
On site
60A
Shared circuit
$1,240
Fixed price, paid in full

The crew

Lena Fischer
EV and solar specialist

Diego Alvarez
Journeyman electrician
Services used
EV charger installation
Load calculation
Smart home
The brief
A second electric car arrived, but the panel only had room for one more big circuit, and a full upgrade was months out.
The owners wanted both cars charged by morning without paying for a new service.


What we did
✓
Checked the panel load before quoting
✓
Ran one 60A circuit to the driveway
✓
Installed two chargers with power sharing
✓
Set charging to off-peak hours in the app
The result
Both cars top up overnight on off-peak power, and the panel never goes over its limit.
C01
Charger one
30A
C02
Charger two
30A
C03
HVAC
40A
C04
Kitchen
20A
C05
Spare
Open
