Electrics for the way you live now
Ready for the EV,
the solar and
whatever is next.
Panel upgrades, chargers, solar and batteries, designed as one system and fitted by licensed electricians at a fixed price.
Live in a home we wired · 14:32
Solar
4.2 kW
Home
1.8 kW
Battery
68%
EV
7.4 kW

EV charger installs · from $649
4.9 ★
From 1,180 verified reviews
“Charger fitted in a morning. The quote and the invoice matched to the dollar.”
Most booked
Panel upgrade to 200A
Fixed at
$1,450
→
Going electric
Electrify in the
right order.
Most homes cannot take a charger, a heat pump and solar on a 100A panel. We plan the sequence so you never pay for the same work twice.

Stage 02
Charge at home
A Level 2 charger on its own circuit adds up to 30 miles of range an hour.
Typical cost
From $649
Time on site
Half a day

Stage 03
Swap gas for electric
Circuits for a heat pump, an induction range or a heat pump water heater.
Typical cost
From $380 a circuit
Time on site
Half a day
Savings estimate
See what going
electric saves.
Move the sliders for a rough yearly figure. Your quote uses your real bills.
Miles driven a week
220 mi
Monthly electric bill
$165
Roof area facing south
420 sq ft
Estimated saving, year one
$1,140
Charging at home
Against public fast charging
$620
Solar offset
A 6.2 kW array on your roof area
$410
Off-peak battery use
Stored overnight, used at peak
$110
Illustrative figures
Recent projects
Homes we have
moved off gas.
All
EV charging
Solar
Lighting
No solar jobs in this short list.
Customer story
“We added the panel, the charger and the battery in that order, like they suggested. Our last bill was $31, and the car has not seen a gas station since March.”

Hannah R.
Lakeway · Panel, charger and battery
$31
Last monthly bill
9.6 kW
Peak home load, managed
3
Visits, six months apart

Solar
6.2 kW
Battery
82%
Charging
11 kW
Offers
Pair the jobs,
keep the saving.
Doing two stages in one visit saves us a trip, so it saves you money.
Questions
Before you go electric.
Do I need a new panel before an EV charger?
Not always. We run a load calculation first. About four homes in ten need an upgrade or a load management device.
Which chargers do you install?
Can you add a battery to existing solar?
Do you handle the utility paperwork?
How long does a panel upgrade take?
Can I do the stages years apart?
Book online
Book a visit in
about a minute.
Pick the job, choose a slot and approve your fixed price before you confirm.
Free today
10 to 12
12 to 2
2 to 4
4 to 6
6 to 8
Emergency · 24/7





