Projects / Offices

A 40-desk office, wired over six nights.

Downtown Austin

Location

6 nights

On site

40

Desks powered

$38,200

Fixed price, paid in full

Stone office corridor lit by pendant lanterns

The crew

Omar Haddad

Omar Haddad

Emergency lead

Diego Alvarez

Diego Alvarez

Journeyman electrician

Services used

Commercial fit-out

Lighting design

Panel upgrade

The brief

The office was moving onto a new floor with the old tenant’s lighting and almost no power at the desks.

The team could not stop working, so every hour of the job had to happen after six in the evening.

Bundled red three-phase cables in a tray
Hallway lit by a lantern and wall sconces

What we did

✓

Worked six nights so the office never closed

✓

Fitted floor boxes under every desk

✓

Replaced the lighting with dimmable LED panels

✓

Labelled and tested every circuit before handover

The result

Forty desks have power and data underfoot, the lights dim with daylight, and the team never lost a working day.

C01

Desk power

20A

C02

Lighting

20A

C03

Kitchen

20A

C04

Server room

30A

C05

Spare

Open

Have a house that needs better light?

Tell us about it and get a fixed price in about a minute.

Have a house that needs better light?

Tell us about it and get a fixed price in about a minute.

Have a house that needs better light?

Tell us about it and get a fixed price in about a minute.

Create a free website with Framer, the website builder loved by startups, designers and agencies.